Open cell ceiling
info@polstraj.uk
+48 534 107 224
  • Main Page
  • About the company
  • Catalogue
    • Offer
    • Open cell ceiling
    • Strip ceiling
    • Installation
  • Realizations
  • Calculate the project
    • Calculate the project
    • Visualizations
  • Contact
  • Cooperation
  • info@polstraj.uk
    +48 534 107 224
Open cell ceiling
  • Main Page
  • About the company
  • Catalogue
    • Offer
    • Open cell ceiling
    • Strip ceiling
    • Installation
  • Calculate the project
    • Calculate the project
    • Visualizations
  • Realizations
  • Contact
  • Cooperation

Suspended ceiling mounting instructions

Step 1. We start the installation of the open cell ceiling by determining its level using a laser level and drawing it on the walls. The distance from the suspended ceiling to the main one must be at least 150 mm.

Step 2. Wall angle bracket is mounted at the perimeter. It is mounted on dowels, the distance between the dowels is 300-500 mm.

Step 3. Lines of the bearing profiles course and the points of fixing the racks are marked on the ceiling. The racks are mounted on dowels previously embedded in the ceiling with a step of 800-1000 mm.
Racks closest to the wall should be fixed at a distance of not more than 600 mm from the wall. The suspension consists of an expansion spring and two rods (with a hook and an eyelet) or a rod and a system rack.

Step 4. Bearing profile are attached to the racks, and when connected with perpendicular crossbars, they form a grid - the structure of the open cell ceiling.
Bearing profiles are connected with each other using connectors.

Step 5. On a flat, clean surface, collect the upper profile and the lower profile of the ceiling into a raster.
Mount open cell ceiling panels from the top to the prepared and properly leveled grid. Bottom profiles in the panel must be parallel to the 2400 mm long bearing profile.

Open Cell Ceiling

Strip ceiling mounting

Step 1. We start the installation of the strip ceiling by determining its level using a laser level and drawing it on the walls. The distance from the suspended ceiling to the main one must be at least 150 mm.

Step 2. Wall angle bracket is mounted at the perimeter. It is mounted on dowels, the distance between the dowels is 300-500 mm.

Step 3.The racks are mounted to the ceiling with expansion bolts with a spacing of 500-1000 mm. Racks closest to the wall should be fixed at a distance of no more than 300 mm from the wall.

Step 4.Attach the spreader booms to the racks.

Step 5.Installation of profiles in spreader booms locks.

Open cell ceiling

POLSTRAJ Sp. z o. o. is the leader in the production and mounting of open cell and strip ceilings in Poland.

Go to tab:

  • Main page
  • About the company
  • Calculate the Project
  • Realizations
  • Contact
  • Cooperation
  • GDPR
  • Privacy policy
Open cell ceiling
Calculate Project
Calculate the price of materials and assembly
Open cell ceiling
How to mount it?
Read the assembly instructions!

Contacts

  • Phone: +48 534 107 224
  • Email: info@polstraj.uk
  • Address: 9 prem. 31 Czerniowiecka Str., 02-705, Warsaw
2021 Created By Kadmix